Thanks for all the suggestions. 11K for ignition, not including all the programming time that will be needed. Yeah my boss will have a puppy over this if we are forced to go this route. Sadly a SCADA system does absolutely nothing to improve our system. It is already way over any of our competition in terms of how well it performs, how easy it is to run, how much data we collect, how we send alarms etc.
SCADA is like the check box for Allen Bradley in this industry. Yep we got that, move along, nothing to see here.
The father of one of our young engineers works for an engineering firm that does industrial control systems. He told me his dad said "They don't use that crap", when referring to the BRX we are using. He is right, there are a lot of things missing from your product.
Things like PLCs that lose their program at the drop of a hat, one that got reloaded every month for 14 years, despite every possible electrical noise filter and even changing out the PLC and all the I/O modules. AIC USB to serial modules so unreliable that we carried two if we were working out of town. Paid tech support telling us that a problem has been known for 3 years and no idea if they will ever fix it. Two software licenses, one for the PLC programming and another for communications and sharing them using dongles, file transfers etc, because they are so expensive. PLCs delivered with Rev 0 firmware that must first have new firmware uploaded before you can use them, and it often takes an hour or more to do so. AB UPS backup units at 5 times the price made specially for them by APC, WITHOUT any surge protection!
Please keep making your crap, because it felt so good to stop pulling out my hair when we abandoned AB 6 years ago.