I haven't tried it with multiple PLCs running to the same HMI, but I typically either jump (under direction of PLC logic) to a popup or full screen alarm or change the main ops screen background color to something alarming like red, or light up an indicator that says "Alarms exist" and let them jump to the alarm screen when they want to.