Just wondering if there are any plans to add to the 16 remote rack limit in Domore? If you start adding drives to the list 12 drives (using the edrv100) and 4 remote I/O racks don't really seem like much. This is probably a whole redesign thing but 16 seems a bit low. I am using the modbus TCP for drives just so i don't get to far into the 16 limit. We have (with drives at plants) 5 cold feed bins 1 rap, 1 Asphalt pump, 1 Exhaust fan, 1 Burner Blower, and now the company wants to put at least 3 other components on drives at every plant. This would be 12 Drives that if we used EDRV100's we wouldn't have much room for remote racks.
Also if you use the terminator you can make the remote rack as big as you want with just adding power supplies but the BRX and H2 versions are limited to the 8 Card or Rack size limits. I have had issues with losing inputs on the terminator series 120v inputs so I'm buying just the BRX series for remote racks now which puts my remotes to 8 cards.
I'm sure there are reasons for the 16 limit but it just seems small to me if you were to use DoMore in a big project. Or you just have to use modbus but it is awful nice to have the drive stuff in the project.