Hi,
I am utilizing an H2-DM1E to control a production tester. I log data from each test to @RamFS with a FILELOG instruction, creating a .csv file. I then Browse the PLC File System to access the log file I am creating.
The problem I am having is that when I power down the PLC, it seems to erase the .csv file in memory.
Does anyone know how to prevent this?
Thanks!