News:

  • June 08, 2026, 03:12:04 AM

Login with username, password and session length

Author Topic: CTRIO2  (Read 35163 times)

WRT

  • Full Member
  • ***
  • Posts: 26
Re: CTRIO2
« Reply #15 on: May 13, 2010, 06:43:09 PM »
Thanks for listening.  Keep my needs in mind as you go about the next design cycle.  Not everything out there is stepper position control.

Really I can almost do this with the current CTRIO if I keep the PPR down to a manageable speed, but the duration timer must not wait for the current count to be picked up by the PLC, it must already be timing the next duration so that I don't keep missing counts (pipeline it).

This sort of thing was easier to do with microcontrollers but I want only off-the-shelf hardware.
« Last Edit: May 13, 2010, 06:51:29 PM by WRT »