Seems like everything I want is out of stock right now. :'(
All of the Built-in I/O BRX with source out and analog are out of stock!
I hope it's not a supply issue. thanks to all the options, I did put together a BXME system that works (but that had to be AC power!)
-
Most likely a supply issue. Almost all sectors that use IC chips are experiencing availability issues.
-
It's a multitude of issues. We are building product, just struggling to get fully caught up after falling behind. The COVID world continues to be a challenge.
-
I received a new ship date for a BX-DM1E-36ED23-D of 4-26 (was 3-19 when I ordered). Any input on if that is an optimistic date or a cautious date? Trying to get a feel on true ship date to know if I need to switch things up to stay on schedule.
Thanks!
-
I received a new ship date for a BX-DM1E-36ED23-D of 4-26 (was 3-19 when I ordered). Any input on if that is an optimistic date or a cautious date? Trying to get a feel on true ship date to know if I need to switch things up to stay on schedule.
Thanks!
According to the last report I got, about half of the backorder was ready to ship (from us to ADC) and boards for the rest were in final assembly. I would say that date is very high confidence.
-
Just got word that a huge pile of product will be leaving for ADC shortly. Haven't seen specifically how that shipment affects the backlog, but it's a very large shipment and contains a significant list of part numbers.
Thank you all for your patience.
-
I recieved it last week. Nice to get some things ahead of schedule!
-
I had a bad DM1E-M-D and the replacement is saying 5/11
-
BX-DM1E-M-Ds out for 3-4 weeks & only 19 120V units on the shelf. I ordered 6 DC & 2 AC.
Component shortages again?
-
BX-DM1E-M-Ds out for 3-4 weeks & only 19 120V units on the shelf. I ordered 6 DC & 2 AC.
Component shortages again?
Never stopped. Getting worse actually.
-
Yeah, I've taken to ordering batches just based on estimated business, but even that's not enough. I keep blowing through them before I get a chance to reorder and then when I do, ADC's out. Good problem to have, everyone keeps claiming? ???
-
Yeah, I've taken to ordering batches just based on estimated business, but even that's not enough. I keep blowing through them before I get a chance to reorder and then when I do, ADC's out. Good problem to have, everyone keeps claiming? ???
We're getting slammed, which makes both manufacturing and procurement harder, which makes stock outs more likely, which causes more slamming. Yeah, good problem... :o