Host Engineering Forum
General Category => Do-more CPUs and Do-more Designer Software => Topic started by: Garyhlucas on May 22, 2023, 08:03:46 PM
-
4 BRX 36 PLCs showed up today, ordered in October! Thanks guys we were sweating it here. Boss was starting to want me to look for other brands. I am way to happy with BRX to do that.
-
4 BRX 36 PLCs showed up today, ordered in October! Thanks guys we were sweating it here. Boss was starting to want me to look for other brands. I am way to happy with BRX to do that.
We are starting to get normal supply of chips and we've doubled our manufacturing capacity. We expect to be fully caught up by July (products in stock), but most of the backlog should be filled in June.