Host Engineering Forum

General Category => ECOMs and ECOM100s => Topic started by: Mike@Forshock on August 23, 2022, 01:10:01 PM

Title: STOCK: H0-ECOM100
Post by: Mike@Forshock on August 23, 2022, 01:10:01 PM
Are these getting that much harder to keep on hand?  :'(

Need to get about a dozen and a half, otherwise may have to replace whole units ($$$) or use external gateway (less integration)
Title: Re: STOCK: H0-ECOM100
Post by: BobO on August 23, 2022, 01:54:40 PM
Are these getting that much harder to keep on hand?  :'(

Need to get about a dozen and a half, otherwise may have to replace whole units ($$$) or use external gateway (less integration)

We got chips for these. Did require some minor board changes, but assuming they got done right, the first should be rolling through production fairly soon.
Title: Re: STOCK: H0-ECOM100
Post by: Mike@Forshock on August 23, 2022, 03:07:56 PM
Are these getting that much harder to keep on hand?  :'(

Need to get about a dozen and a half, otherwise may have to replace whole units ($$$) or use external gateway (less integration)

We got chips for these. Did require some minor board changes, but assuming they got done right, the first should be rolling through production fairly soon.

Fantastic, thank you.