In a past post someone said just use a Do-More! OK how about this.

I had to keep most of the systems running so it was a multistep process.
Move the 450 rack two out of the way.
Install a temporary 450 PLC where rack two was.
Consolidate the two 450 racks into the temporary 450 PLC.
Install the DM, write the program and cut the loops over one at a time.

Title: Re: 450 to Do-More
Post by: plcnut on December 30, 2014, 01:37:59 PM
Nice!
Title: Re: 450 to Do-More
Post by: franji1 on December 30, 2014, 01:51:32 PM
In a past post someone said just use a Do-More! OK how about this.
Amazing job!
Title: Re: 450 to Do-More
Post by: Controls Guy on December 30, 2014, 02:27:43 PM
Wow!!   You definitely da man!    8)
Title: Re: 450 to Do-More
Post by: boardmaker on December 31, 2014, 09:44:13 AM
Very nice!