Hello,
I have very little experience with PLC programming. I have been helping someone get a wind generator up and running. It has 135 rungs, 15 inputs, 7 outputs, 2 analog inputs, no analog outputs. It has 1 high speed counter, several timers and a lot of math calculations that did not convert properly. I want to be able to remote access it and therefore am considering converting it to Do-More. Is this a good idea?
I ran the Do-more conversion software and got 70 warnings and 67 messages. It looks very overwhelming to me. I am looking for someone to convert it for me or talk me through it.
Thanks
Mike