Host Engineering Forum
 
*
Welcome, Guest. Please login or register.
Did you miss your activation email?
February 08, 2012, 06:26:19 am


Login with username, password and session length


Pages: 1 [2]
  Print  
Author Topic: CTRIO2  (Read 1752 times)
WRT
Full Member
***
Posts: 25


« Reply #15 on: May 13, 2010, 06:43:09 pm »

Thanks for listening.  Keep my needs in mind as you go about the next design cycle.  Not everything out there is stepper position control.

Really I can almost do this with the current CTRIO if I keep the PPR down to a manageable speed, but the duration timer must not wait for the current count to be picked up by the PLC, it must already be timing the next duration so that I don't keep missing counts (pipeline it).

This sort of thing was easier to do with microcontrollers but I want only off-the-shelf hardware.
« Last Edit: May 13, 2010, 06:51:29 pm by WRT » Logged
Pages: 1 [2]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.16 | SMF © 2011, Simple Machines

Valid XHTML 1.0! Valid CSS! Dilber MC Theme by HarzeM